The Leading Company in Environmental Services and Technology Since 1994!

Comprehensive Environmental Services for Well Drilling and Rehabilitation

Drilling, constructing, and rehabilitating hydrocarbon production wells can generate a large amount of waste and leave a sizeable environmental impact. To avoid this, strict environmental control must be exercised during activities related to well construction and rehabilitation.

Evergreen Service, C.A. can offer continuous environmental support for multiple drills simultaneously during well drilling operations. In order to provide an exemplary service, we use the following equipment:

  • Housing, office, and laboratory trailers.
  • 500 barrel-capacity tanks.
  • 250 barrel-capacity open top containers (dumpsters).
  • Containers for hazardous and domestic waste.
  • Wastewater treatment plant.
  • Pneumatic pump with accessories.
  • Modular vacuum.
  • Backhoe.
  • Dump trucks of varying sizes and vacuum trucks for waste transportation.

In addition to our first-rate equipment, we offer the following well on-site services:

  • Cleaning the tanks in drill rigs.
  • Cleaning the location of drill rigs before and after drilling operations.
  • Collection, transportation, and final disposal of domestic waste.
  • Collection, transportation, and final disposal of used oils.
  • Collection, transportation, treatment, and final disposal of hazardous waste.
  • Collection, transportation, treatment, and final disposal of drill cuttings.
  • Collection, transportation, treatment, and final disposal of drilling fluid.
  • Collection, transportation, treatment, and final disposal of industrial waters.
EVERGREEN SERVICE C.A.